Water services
Low water-pressure survey for a multi-flat building
A multi-flat building was experiencing poor water pressure and needed a practical improvement plan.
Scope
How we approach this work.
The survey scope considers incoming performance, storage requirements and a boosted arrangement suited to demand before equipment is specified.
- Incoming supply reviewed
- Storage requirement considered
- Twin-booster concept assessed
- Space, access and pipework implications recorded
Service objective
The aim of the work.
The aim is to establish the system requirements and a sound basis for a quotation before equipment is purchased.
Service example based on a requested scope. This page does not claim a completed installation or maintenance contract.
Need an engineer?
Tell us what needs attention.
Send the postcode, appliance or system details and a short description. Photos and fault codes are welcome.